Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Crown-cash-feedback@a220149.com
Gaming-platform-website-service@anna-mina.com
皇冠体育
Football-buying-contactus@gonefishingpress.com
永利博彩
内江赶集网
正规博彩平台
Sports-in-Sabah-contact@hr888888.com
绵阳百姓网
微软必应搜索
牟长青个人博客
马鞍山二中
365体育
如皋新闻网
app-recommendation-careers@j220149.com
霍州煤电集团有限责任公司
博彩平台网址大全
Sun-City-official-website-contact@dp120.com
赌博网站推荐
中央气象台
《全球使命2》官方网站
金华天气预报
河南重型
OK123
迈克尔·杰克逊中国网
物产中大集团
腾讯读书
广生行
可可英语对话
和合玉器
布朗博士
中国惠民
郑州大学远程教育平台
apk安卓网
站点地图